A two-stage flow shop scheduling with a critical machine and batch availability
From MaRDI portal
Publication:2978425
DOI10.2478/v10209-011-0004-yzbMath1360.90126OpenAlexW2059924732MaRDI QIDQ2978425
Publication date: 25 April 2017
Published in: Foundations of Computing and Decision Sciences (Search for Journal in Brave)
Full work available at URL: https://www.degruyter.com/view/j/fcds.2012.37.issue-1/v10209-011-0004-y/v10209-011-0004-y.xml?format=INT
Related Items (3)
Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines ⋮ The optimal number of used machines in a two-stage flexible flowshop scheduling problem ⋮ Batch scheduling in a two-stage flexible flow shop problem
Cites Work
- A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machine
- Flow shop and open shop scheduling with a critical machine and two operations per job
- Comments on Flow shop and open shop scheduling with a critical machine and two operations per job
This page was built for publication: A two-stage flow shop scheduling with a critical machine and batch availability