A finite-capacity production scheduling procedure for a Belgian steel company
From MaRDI portal
Publication:3012635
DOI10.1080/00207540701441970zbMath1216.90043OpenAlexW2060208689MaRDI QIDQ3012635
Dieter Debels, Mario Vanhoucke
Publication date: 6 July 2011
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701441970
Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Cites Work
- A note on two problems in connexion with graphs
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
- Integration of continuous caster and hot strip mill planning for steel production
- The hot strip mill production scheduling problem: A tabu search approach
- A mathematical programming model for scheduling steelmaking-continuous casting production
- A Polynomial-Time Algorithm for the Knapsack Problem with Two Variables
- Steel production schedule generation
- Steel-making process scheduling using Lagrangian relaxation
- Development of a knowledge model for managing schedule disturbance in steel-making
- Auction-based approach to resolve the scheduling problem in the steel making process
- Model for cost estimation in a finite-capacity environment
- A review of planning and scheduling systems and methods for integrated steel production
This page was built for publication: A finite-capacity production scheduling procedure for a Belgian steel company