Steel production schedule generation
From MaRDI portal
Publication:4245204
Recommendations
- A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry
- A finite-capacity production scheduling procedure for a Belgian steel company
- The hot strip mill production scheduling problem: A tabu search approach
- Simultaneously scheduling multiple turns for steel color-coating production
- Hierarchical approach to steel production scheduling under a global energy constraint
Cited in
(21)- Simultaneously scheduling multiple turns for steel color-coating production
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
- Integration of continuous caster and hot strip mill planning for steel production
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill
- Iron ore production scheduling to improve product quality
- A hybrid flowshop scheduling problem for a cold treating process in seamless steel tube production
- A finite-capacity production scheduling procedure for a Belgian steel company
- A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry
- A nested column generation algorithm to the meta slab allocation problem in the steel making industry
- Scheduling continuous aluminium casting lines
- scientific article; zbMATH DE number 686971 (Why is no real title available?)
- A Tire Production Scheduling System for Bridgestone/Firestone Off-The-Road
- scientific article; zbMATH DE number 1179853 (Why is no real title available?)
- Optimal torpedo scheduling
- Solving the torpedo scheduling problem
- Fulfilling orders for steel plates from existing inventory
- Auction-based approach to resolve the scheduling problem in the steel making process
- A review of planning and scheduling systems and methods for integrated steel production
- A branch-and-price algorithm to solve the molten iron allocation problem in iron and steel industry
- A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex
- Hierarchical approach to steel production scheduling under a global energy constraint
This page was built for publication: Steel production schedule generation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245204)