Scheduling continuous aluminium casting lines
From MaRDI portal
Recommendations
- A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry
- A two-phase model for planning the production of aluminum ingot
- A GRASP heuristic for slab scheduling at continuous casters
- Flow shop scheduling at continuous casters with flexible job specifications
- Scheduling a hot rolling mill
Cites work
- A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
- A review of planning and scheduling systems and methods for integrated steel production
- Exact algorithms for scheduling multiple families of jobs on parallel machines
- Heuristic scheduling of parallel machines with sequence-dependent set-up times
- Real-time vehicle routing: Solution concepts, algorithms and parallel computing strategies.
- Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic
- Steel production schedule generation
- Steel-making process scheduling using Lagrangian relaxation
- The hot strip mill production scheduling problem: A tabu search approach
Cited in
(3)
This page was built for publication: Scheduling continuous aluminium casting lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3541174)