Capacity planning with sequential two-level time constraints in the back-end process of wafer fabrication
From MaRDI portal
Publication:3055222
DOI10.1080/00207540802415568zbMath1198.90282OpenAlexW1988856755MaRDI QIDQ3055222
Publication date: 7 November 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802415568
production planningproduction managementproduction controloperational researchcapacity planningsemiconductor manufacture
Queues and service in operations research (90B22) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items (3)
Part sojourn time distribution in a two-machine line ⋮ Robust production capacity planning under uncertain wafer lots transfer probabilities for semiconductor automated material handling systems ⋮ A proportional value for cooperative games with a coalition structure
Cites Work
This page was built for publication: Capacity planning with sequential two-level time constraints in the back-end process of wafer fabrication