Single machine scheduling with two competing agents and equal job processing times

From MaRDI portal
Publication:319290


DOI10.1016/j.ejor.2015.01.003zbMath1346.90378MaRDI QIDQ319290

Dvir Shabtay, George Steiner, Daniel Oron

Publication date: 6 October 2016

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2015.01.003


90C29: Multi-objective and goal programming

90B35: Deterministic scheduling theory in operations research


Related Items

Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work, Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work, Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work, Two-agent single-machine scheduling with a rate-modifying activity, Competitive two-agent scheduling with release dates and preemption on a single machine, Single machine scheduling with two competing agents, arbitrary release dates and unit processing times, Two-agent scheduling in a flowshop, Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time, Two-agent parallel-machine scheduling with rejection, Two-agent supply chain scheduling problem to minimize the sum of the total weighted completion time and batch cost, A note on competing-agent Pareto-scheduling, Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work, Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs, Single-machine online scheduling of jobs with non-delayed processing constraint, Pareto-scheduling of two competing agents with their own equal processing times, Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost, Single-machine scheduling with multi-agents to minimize total weighted late work, Two competitive agents to minimize the weighted total late work and the total completion time, Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times, Bicriteria scheduling of equal length jobs on uniform parallel machines, Scheduling with release dates and preemption to minimize multiple max-form objective functions, Two-agent scheduling problems on a single-machine to minimize the total weighted late work, Scheduling with two competing agents to minimize total weighted earliness, Scheduling with competing agents, total late work and job rejection



Cites Work