Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty
From MaRDI portal
(Redirected from Publication:323260)
Recommendations
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines
Cites work
- scientific article; zbMATH DE number 3914081 (Why is no real title available?)
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- A sliding time window heuristic for open pit mine block sequencing
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- An application of branch and cut to open pit mine scheduling
- Block simulation of multiple correlated variables
- Direct sequential co-simulation with joint probability distributions
- Geostatistics. Modeling spatial uncertainty.
- Introduction to stochastic programming.
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Progressive hedging and tabu search applied to mixed integer (0,1) multistage stochastic programming
- Progressive hedging as a meta-heuristic applied to stochastic lot-sizing
- Progressive hedging-based metaheuristics for stochastic network design
- Robust planning for an open-pit mining problem under ore-grade uncertainty
- Scenario grouping in a progressive hedging-based meta-heuristic for stochastic network design
- Scenarios and Policy Aggregation in Optimization Under Uncertainty
- Solving LP relaxations of large-scale precedence constrained problems
Cited in
(17)- Stochastic forestry planning under market and growth uncertainty
- A progressive hedging method for the optimization of social engagement and opportunistic IoT problems
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Learning to schedule heuristics for the simultaneous stochastic optimization of mining complexes
- A simulated annealing approach to mine production scheduling
- A framework for adaptive open-pit mining planning under geological uncertainty
- Stochastic optimization in mine planning scheduling
- Solving LTPSOP in open-pit mines using Gaussian process and human mental search
- Hyper-heuristic approaches for strategic mine planning under uncertainty
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- Progressive hedging as a meta-heuristic applied to stochastic lot-sizing
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- Application of an improved Lagrangian relaxation approach in the constrained long-term production scheduling problem under grade uncertainty
- A granular local search matheuristic for a heterogeneous fleet vehicle routing problem with stochastic travel times
- A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
- Soft clustering-based scenario bundling for a progressive hedging heuristic in stochastic service network design
This page was built for publication: Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q323260)