Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty
DOI10.1016/J.EJOR.2016.03.007zbMATH Open1346.90363OpenAlexW2295949192MaRDI QIDQ323260FDOQ323260
Authors: Amina Lamghari, Roussos Dimitrakopoulos
Publication date: 7 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2016.03.007
Recommendations
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines
metaheuristicsLagrangian relaxationopen-pit mine production schedulingprogressive hedging methodsliding time window heuristic
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Geostatistics. Modeling spatial uncertainty.
- Title not available (Why is that?)
- Introduction to stochastic programming.
- Scenarios and Policy Aggregation in Optimization Under Uncertainty
- An application of branch and cut to open pit mine scheduling
- Solving LP relaxations of large-scale precedence constrained problems
- Progressive hedging and tabu search applied to mixed integer (0,1) multistage stochastic programming
- Scenario grouping in a progressive hedging-based meta-heuristic for stochastic network design
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- A sliding time window heuristic for open pit mine block sequencing
- Robust planning for an open-pit mining problem under ore-grade uncertainty
- Block simulation of multiple correlated variables
- Progressive hedging-based metaheuristics for stochastic network design
- Progressive hedging as a meta-heuristic applied to stochastic lot-sizing
- Direct sequential co-simulation with joint probability distributions
Cited In (17)
- A progressive hedging method for the optimization of social engagement and opportunistic IoT problems
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines
- Learning to schedule heuristics for the simultaneous stochastic optimization of mining complexes
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- A simulated annealing approach to mine production scheduling
- A framework for adaptive open-pit mining planning under geological uncertainty
- Stochastic optimization in mine planning scheduling
- Solving LTPSOP in open-pit mines using Gaussian process and human mental search
- Hyper-heuristic approaches for strategic mine planning under uncertainty
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- Progressive hedging as a meta-heuristic applied to stochastic lot-sizing
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- Application of an improved Lagrangian relaxation approach in the constrained long-term production scheduling problem under grade uncertainty
- A granular local search matheuristic for a heterogeneous fleet vehicle routing problem with stochastic travel times
- A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
- Soft clustering-based scenario bundling for a progressive hedging heuristic in stochastic service network design
- Stochastic forestry planning under market and growth uncertainty
This page was built for publication: Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q323260)