An experimental comparison of periodic timetabling models
From MaRDI portal
Publication:336491
DOI10.1016/J.COR.2013.04.002zbMATH Open1348.90311OpenAlexW2153287601MaRDI QIDQ336491FDOQ336491
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2013.04.002
Recommendations
Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Strong Formulations for the Multi-module PESP and a Quadratic Algorithm for Graphical Diophantine Equation Systems
- A Mathematical Model for Periodic Scheduling Problems
- Nominal and robust train timetabling problems
- Modeling and Solving the Train Timetabling Problem
- Integrating Routing Decisions in Network Problems
- A bicriteria approach for robust timetabling
- Integral cycle bases for cyclic timetabling
- Periodic network optimization with different arc frequencies
- The complexity of integrating routing decisions in public transportation models
- Solving periodic timetable optimisation problems by modulo simplex calculations
- Models for railway track allocation
- Improving the modulo simplex algorithm for large-scale periodic timetabling
- Algorithms - ESA 2003
- Non-cyclic train timetabling and comparability graphs
Cited In (11)
- Timetable rearrangement to cope with railway maintenance activities
- Line planning with user-optimal route choice
- Railway timetabling with integrated passenger distribution
- Parcel Distribution Timetabling Problem with Incomplete Hub Network
- Simulation Exercise on Time Perception Parameters in Discrete‐time Dynamic Assignment Models
- An iterative heuristic for passenger-centric train timetabling with integrated adaption times
- Introducing TimPassLib -- a library for integrated periodic timetabling and passenger routing
- Performance of algorithms for periodic timetable optimization
- Constructing periodic timetables using MIP -- a case study from DSB S-train
- Delay resistant line planning with a view towards passenger transfers
- Timetabling with passenger routing
Uses Software
This page was built for publication: An experimental comparison of periodic timetabling models
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q336491)