Minimizing the assembly cycle time on a revolver gantry machine
DOI10.1016/J.COR.2013.04.014zbMATH Open1348.90449OpenAlexW1980577262MaRDI QIDQ336590FDOQ336590
Authors: Sami Pyöttiälä, Timo Knuutila, Mika Johnsson, Olli S. Nevalainen
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2013.04.014
Recommendations
- PCB assembly scheduling with alternative nozzle types for one component type
- A heuristic for multiple-feeder PCB manufacturing
- Construction of component tapes for radial placement machines
- Scheduling Component Placement Operations for Collect-and-Place Type PCB Assembly Machines
- PCB assembly scheduling for collect-and-place machines using genetic algorithms
optimizationprinted circuit boardcollect-and-placeelectronics assemblygantry machinemulti-spindle placement machinenozzleproduction controlrevolver head
Cites Work
- Optimization of printed circuit board manufacturing: Integrated modeling and algorithms
- Minimizing the number of pickups on a multi-head placement machine
- PCB assembly scheduling for collect-and-place machines using genetic algorithms
- Optimization of the movements of a component placement machine
- Construction of component tapes for radial placement machines
Cited In (6)
- A heuristic for multiple-feeder PCB manufacturing
- Construction of component tapes for radial placement machines
- Minimizing the number of pickups on a multi-head placement machine
- How to minimize cycle times of robot manufacturing systems
- PCB assembly scheduling with alternative nozzle types for one component type
- Selecting the nozzle assortment for a gantry-type placement machine
This page was built for publication: Minimizing the assembly cycle time on a revolver gantry machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q336590)