Scheduling Component Placement Operations for Collect-and-Place Type PCB Assembly Machines
From MaRDI portal
Publication:5392003
DOI10.1007/978-3-642-00142-0_21zbMATH Open1209.90176OpenAlexW2281127809MaRDI QIDQ5392003FDOQ5392003
Serol Bulkan, Özgür Kulak, Hans-Otto Günther
Publication date: 7 April 2011
Published in: Operations Research Proceedings 2008 (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-00142-0_21
Recommendations
- PCB assembly scheduling for collect-and-place machines using genetic algorithms
- Component allocation for printed circuit board assembly using modular placement machines
- Component allocation and job sequencing for two series-connected SMD placement machines
- A new novel local search integer-programming-based heuristic for PCB assembly on collect-and-place machines
- A planning and scheduling model for onsertion in printed circuit board assembly
- PCB assembly scheduling with alternative nozzle types for one component type
- Design and scheduling of flexible assembly lines for printed circuit boards
- Efficient operation methods for a component placement machine using the patterns on printed circuit boards
- Component Fixture Positioning/Sequencing for Printed Circuit Board Assembly with Concurrent Operations
- Process planning for circuit card assembly on a series of dual head placement machines
Cited In (9)
- Construction of component tapes for radial placement machines
- PCB assembly scheduling for collect-and-place machines using genetic algorithms
- Component allocation for printed circuit board assembly using modular placement machines
- A single machine carryover sequence-dependent group scheduling in PCB manufacturing
- Process planning for circuit card assembly on a series of dual head placement machines
- A planning and scheduling model for onsertion in printed circuit board assembly
- Precedence constrained TSP arising in printed circuit board assembly
- Facility-Wide Planning and Scheduling of Printed Wiring Board Assembly
- Component Fixture Positioning/Sequencing for Printed Circuit Board Assembly with Concurrent Operations
This page was built for publication: Scheduling Component Placement Operations for Collect-and-Place Type PCB Assembly Machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5392003)