How to minimize cycle times of robot manufacturing systems
From MaRDI portal
(Redirected from Publication:2139147)
Recommendations
- Cyclic scheduling in a robotic production line
- scientific article; zbMATH DE number 2232353
- Cyclic scheduling in robotic flowshops
- Minimizing the number of robots to meet a given cyclic schedule
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times
- scientific article; zbMATH DE number 1358052
- Minimizing the assembly cycle time on a revolver gantry machine
- The Basic Cyclic Scheduling Model For Robotic Flow Shops
- scientific article; zbMATH DE number 1724445
- Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints
Cites work
- scientific article; zbMATH DE number 5343212 (Why is no real title available?)
- A Mathematical Model for Periodic Scheduling Problems
- Combinatorial optimization. Theory and algorithms.
- Cycle bases in graphs characterization, algorithms, complexity, and applications
- Integral cycle bases for cyclic timetabling
- Periodic Timetable Optimization in Public Transport
- Reducibility among combinatorial problems
Cited in
(2)
This page was built for publication: How to minimize cycle times of robot manufacturing systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2139147)