How to minimize cycle times of robot manufacturing systems
DOI10.1007/S11081-020-09531-WzbMATH Open1489.90028OpenAlexW3043145962MaRDI QIDQ2139147FDOQ2139147
Publication date: 17 May 2022
Published in: Optimization and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11081-020-09531-w
Programming involving graphs or networks (90C35) Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Paths and cycles (05C38)
Cites Work
- Title not available (Why is that?)
- A Mathematical Model for Periodic Scheduling Problems
- Reducibility among Combinatorial Problems
- Combinatorial optimization. Theory and algorithms.
- Cycle bases in graphs characterization, algorithms, complexity, and applications
- Periodic Timetable Optimization in Public Transport
- Integral cycle bases for cyclic timetabling
Cited In (2)
Uses Software
Recommendations
- Title not available (Why is that?) π π
- Title not available (Why is that?) π π
- Title not available (Why is that?) π π
- Cyclic scheduling in a robotic production line π π
- Minimizing the number of robots to meet a given cyclic schedule π π
- Cyclic scheduling in robotic flowshops π π
- Minimizing the assembly cycle time on a revolver gantry machine π π
- Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints π π
- The Basic Cyclic Scheduling Model For Robotic Flow Shops π π
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times π π
This page was built for publication: How to minimize cycle times of robot manufacturing systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2139147)