An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand
From MaRDI portal
Publication:3391978
DOI10.1287/OPRE.1050.0258zbMATH Open1167.90525OpenAlexW2109166018MaRDI QIDQ3391978FDOQ3391978
Abraham Grosfeld-Nir, Shoshana Anily
Publication date: 13 August 2009
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/aece8cd5675573ce3969abd7e9b15b12ed48dc13
Recommendations
- scientific article; zbMATH DE number 1156571
- Integrated inventory and inspection policies for stochastic demand
- Optimal lot sizing policy for non-instantaneous deteriorating items with price and advertisement dependent demand under partial backlogging
- Approximations for non-stationary stochastic lot-sizing under \((s,Q)\)-type policy
- Dynamic lot sizing with random demand and non-stationary costs
- Optimal lot sizing with maintenance actions and imperfect production processes
- Optimal lot-sizing in multi-item production inventories
- An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length
Management decision making, including multiple objectives (90B50) Applications of Markov renewal processes (reliability, queueing networks, etc.) (60K20)
Cited In (10)
- Quality control for products supplied with warranty
- Production to order and off-line inspection when the production process is partially observable
- The optimal production and quality policy for the vendor in a trade
- AN OFFLINE INSPECTION AND DISPOSITION MODEL INCORPORATING DISCRETE WEIBULL DISTRIBUTION AND MANUFACTURING VARIATION
- Buffer dimensioning and control stations positioning with a space partitioning-tabu search approach
- A newsvendor analysis of a binomial yield production process
- Dynamic Control of Quality in Production-Inventory Systems
- A two-state partially observable Markov decision process with three actions
- Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control
- Sequential Inspection Under Capacity Constraints
This page was built for publication: An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3391978)