Schedulingn nonoverlapping jobs and two stochastic jobs in a flow shop
From MaRDI portal
Publication:3754431
DOI10.1002/NAV.3800330111zbMATH Open0617.90048OpenAlexW2157519844MaRDI QIDQ3754431FDOQ3754431
Authors:
Publication date: 1986
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800330111
Recommendations
Cited In (6)
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Title not available (Why is that?)
- Stochastically minimizing total flowtime in flowshops with no waiting space
- Title not available (Why is that?)
This page was built for publication: Schedulingn nonoverlapping jobs and two stochastic jobs in a flow shop
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3754431)