scientific article; zbMATH DE number 4091167
This interesting monograph studies production policies for goods which, for a variety of reasons, e.g., are too bulky to store, or are only produced when an order is at hand. The simplest production rule - produce the goods immediately upon receipt of an order and cease production when the order is filled - is inadvisable because a lengthy and costly set-up procedure must be followed each time production begins anew. In such circumstances orders must be amassed, with backlogging, until it is deemed economical to produce. A wide variety of possible production situations and rules are studied and contrasted. Among the cases covered are: is there a single product to be produced or several; is production non-cyclic or is there a fixed- length production cycle; is production capacity limited or unlimited; are orders received during production filled immediately or only orders received before the set-up procedure began. Following two introductory chapters, the first substantive chapter analyzes fixed-cycle production rules. The primary focus of the text, however, is on non-cyclic rules. Cyclic rules provide an interesting base case, and from the performance of the fixed-cycle rules one can judge the improvement that non-fixed rules provide. The next three chapters discuss non-fixed cycle rules in far greater detail. The first of these covers the case where only a single type of item is produced. The emphasis is not on finding a single ``optimal rule, but on discussing a number of almost optimal heuristic rules which make up in simplicity and ease of implementation what they lack in optimality. Among the rules discussed are the Silver-Meal and the Wagner-Whitin heuristics. Considerable attention is given to a new rule of the author's, the (x,T) rule: do not produce if backlogged orders are less than x, if production is justified, produce enough to satisfy all orders due within T periods of the present. The effect of using each rule is studied both in theory and through simulation runs. The next two chaptes extend the model studied to situations where more than one item is produced. As with the previous chapter, a variety of possible rules are studied including two possible extensions of the (x,T) rule, the extended (x,T) rule and the multi-(x,T) rule, and numerous numerical results comparing the effects of the various policies are given. The last substantive chapter studies the effect of using the exteded (x,T) rule in complex situations. These involve: several product types with different demand rates; set-ups between types; orders with different priorities; backlogging capacity constraints and overtime possibilities. The various cases listed in the previous sentence indicate the variety of situations covered in the text and the difficulties faced by a reviewer to provide an adequate yet concise report of such a rich work.
- Production to order. Models and rules for production planning
- On integrated production-replenishment policies in single-stage manufacturing
- A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System
- The control of inventories and production rates -- a survey
- General rules for production planning with seasonal demand
- Production to order. Models and rules for production planning
- Production strategies for a stochastic lot-sizing problem with constant capacity
- Approximate solutions for a stochastic lot-sizing problem with partial customer-order information
- Plan optimisation algorithm given with line chart
- Make to order or make to stock: model and application
- Optimal order-selection policies for a job shop production system
- Note—Controlling Inventories in an Acyclic Assembly System
- General rules for production planning with seasonal demand
- Optimal Production Sequence for a Product with Matching Components
- Performance of infra-plant overtime policies
- A robust policy for serial agile production systems
- The control of inventories and production rates -- a survey
- Operations research in production control -- a progress report
- An approach to linear inventory-production rules
- An approximate dynamic programming approach for <scp>production‐delivery</scp> scheduling under non‐stationary demand
- The stochastic economic lot scheduling problem: a survey
- A cyclic versus flexible approach to materials ordering in make-to-order assembly
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3818786)