A heuristic approach to a single stage assembly problem with transportation allocation
From MaRDI portal
Publication:387489
DOI10.1016/J.AMC.2012.04.066zbMATH Open1278.90054OpenAlexW2028882502MaRDI QIDQ387489FDOQ387489
Authors: Peng-Sheng You, Yi-Chih Hsieh
Publication date: 23 December 2013
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2012.04.066
Recommendations
- Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
- A hybrid tabu search heuristic for the two-stage assembly scheduling problem
- Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies
- Coordination of production and transportation in supply chain scheduling
- Minimizing production flow time in a process and assembly job shop
Cites Work
- Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
- Machine scheduling with transportation considerations
- Integrated Scheduling of Production and Distribution Operations
- Branch and price for the vehicle routing problem with discrete Split deliveries and time windows
- Synchronized development of production, inventory, and distribution schedules
- Supply chain inventory optimization with two customer classes in discrete time
- Optimal due-date assignment and sequencing
- The split delivery vehicle scheduling problem with time windows and grid network distances
- A tabu search heuristic for the split delivery vehicle routing problem with production and demand calendars
- Optimization of production allocation and transportation of customer orders for a leading forest products company
- Optimal inventory policies with two modes of freight transportation
- Application of Mathematical Programming to a Large-scale Agricultural Production and Distribution System
- Improved methods of assembly sequence determination for automatic assembly systems
- Two-stage inventory models with a bi-modal transportation cost
- A comparison of outbound dispatch policies for integrated inventory and transportation decisions
Cited In (3)
Uses Software
This page was built for publication: A heuristic approach to a single stage assembly problem with transportation allocation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q387489)