A Horizon-Varying, Zero-One Approach to Project Scheduling
From MaRDI portal
Publication:4058461
DOI10.1287/MNSC.20.6.990zbMATH Open0303.90026OpenAlexW2042583024MaRDI QIDQ4058461FDOQ4058461
Authors: James H. Patterson, Walter D. Huber
Publication date: 1974
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.20.6.990
Cited In (26)
- A comparative study of computational procedures for the resource constrained project scheduling problem
- Reducing the feasible solution space of resource-constrained project instances
- A Multiobjective Resource-Constrained Project-Scheduling Problem
- A multiple-tree search procedure for the resource-constrained project scheduling problem
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Resource-constrained project scheduling: A survey of recent developments.
- Improving electromagnetism algorithm for solving resource allocation problem in stochastic networks
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- Strong bounds for resource constrained project scheduling: preprocessing and cutting planes
- Going to the core of hard resource-constrained project scheduling instances
- A new mathematical model for hybrid flow shop under time-varying resource and exact time-lag constraints
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
- Branch-and-cut-and-price algorithms for the preemptive RCPSP
- A neurogenetic approach for the resource-constrained project scheduling problem
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
- A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project
- Improved tabu search heuristics for the dynamic space allocation problem
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem
- Project scheduling and equipment planning with random breakdowns
- Resource constrained project scheduling: Modelling with multiple alternatives
- Hierarchical models for multi-project planning and scheduling
- A constraint-based perspective in resource constrained project scheduling
- Resource-constrained project scheduling by simulated annealing
- MIP heuristics for a resource constrained project scheduling problem with workload stability constraints
This page was built for publication: A Horizon-Varying, Zero-One Approach to Project Scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4058461)