Due-Dates and Instantaneous Load in the One-Machine Shop
From MaRDI portal
Publication:4105988
DOI10.1287/MNSC.23.4.444zbMath0338.90040OpenAlexW2131979940MaRDI QIDQ4105988
Publication date: 1976
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.23.4.444
Numerical mathematical programming methods (65K05) Integer programming (90C10) Deterministic scheduling theory in operations research (90B35)
Related Items (3)
Real-time prediction of order flowtimes using support vector regression ⋮ Real-time due-date promising by build-to-order environments ⋮ Lead time selection and the behaviour of work flow in job shops
This page was built for publication: Due-Dates and Instantaneous Load in the One-Machine Shop