A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment
From MaRDI portal
Publication:4245677
DOI10.1080/002075498192427zbMATH Open0953.90548OpenAlexW2117771167MaRDI QIDQ4245677FDOQ4245677
Authors: Joseph Bukchin
Publication date: 30 January 2001
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498192427
Recommendations
- Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication
- Comparisons of two-machine line models in throughput analysis
- A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
- Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
- A kanban-based simulation study of a mixed model just-in-time manufacturing line
- Evaluation of performance measures for representing operational objectives of a mixed model assembly line balancing problem
- The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Modelling the performance of a kanban assembly shop
- Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
Cited In (10)
- Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload
- Using distributed search methods for balancing mixed-model assembly lines in the automotive industry
- Balancing mixed-model assembly lines using adjacent cross-training in a demand variation environment
- A survey on problems and methods in generalized assembly line balancing
- An MCDA-DEA approach for mixed-model assembly line balancing problem under uncertainty
- Supporting offshoring and nearshoring decisions for mass customization manufacturing processes
- A kanban-based simulation study of a mixed model just-in-time manufacturing line
- Sequence-to-customer goal with stochastic demands for a mixed-model assembly line
- Evaluation of mixed-model U-line operational designs
- Evaluation of performance measures for representing operational objectives of a mixed model assembly line balancing problem
This page was built for publication: A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245677)