Supply chain coordination with controllable lead time and asymmetric information
From MaRDI portal
Publication:439339
DOI10.1016/J.EJOR.2011.09.003zbMATH Open1244.90040OpenAlexW2096646882MaRDI QIDQ439339FDOQ439339
Authors: Yina Li, Xuejun Xu, Xiande Zhao, Jeff Hoi Yan Yeung, Fei Ye
Publication date: 16 August 2012
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2011.09.003
Recommendations
- The coordination model in supply chain based on asymmetric information and VMI pattern
- A coordination mechanism for supply chains with capacity expansions and order-dependent lead times
- Promised Lead-Time Contracts Under Asymmetric Information
- Coordinating a two-stage supply chain under asymmetric demand information
- scientific article; zbMATH DE number 5583195
supply chain managementasymmetric informationcontrollable lead timecoordination mechanismside payment
Cites Work
- The bargaining problem
- Fuzzy mixture inventory model involving fuzzy random variable lead-time demand and fuzzy total demand
- Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment
- A bargaining model with asymmetric information for a single supplier-single buyer problem
- Inventory Models Involving Lead Time as a Decision Variable
- Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time
- Title not available (Why is that?)
- A Generalized Nash Solution for Two-Person Bargaining Games with Incomplete Information
- Ordering and pricing decisions in a two-echelon supply chain with asymmetric demand information
- Contracting to assure supply: how to share demand forecasts in a supply chain
- Competitive and cooperative inventory policies in a two-stage supply chain
- Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction
- A supplier's optimal quantity discount policy under asymmetric information
- When should a manufacturer share truthful manufacturing cost information with a dominant retailer?
- Contracting with an urgent supplier under cost information asymmetry
- Stochastic Inventory Systems in a Supply Chain with Asymmetric Information: Cycle Stocks, Safety Stocks, and Consignment Stock
- Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments
- A study of an integrated inventory with controllable lead time
- A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items
- Title not available (Why is that?)
- Lead-time reduction in a stochastic inventory system with learning consideration
Cited In (18)
- Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games
- Setup cost reduction and supply chain coordination in case of asymmetric information
- A coordination mechanism for supply chains with capacity expansions and order-dependent lead times
- Promised Lead-Time Contracts Under Asymmetric Information
- Time-based multiple pricing policy in a supply chain with perishable products under bilateral asymmetric information
- Coordinating supply chains with stochastic demand by crashing lead times
- Green channel coordination under asymmetric information
- The optimal product pricing and carbon emissions reduction profit allocation of CET-covered enterprises in the cooperative supply chain
- Decentralized supply chains subject to information delays
- Scalable methodology for supply chain inventory coordination with private information
- A manufacturer-buyers integrated inventory model with generic distribution of lead times to deliver equal and/or unequal batch sizes
- Optimization of fuzzy integrated inventory model with ordering cost reduction dependent on lead time
- The coordination model in supply chain based on asymmetric information and VMI pattern
- Operational strategy for low-carbon supply chain under asymmetric information of fairness concerns
- Response time and vendor-assembler relationship in a supply chain
- Hierarchical coordination mechanisms within the supply chain.
- A distributed coordination mechanism for supply networks with asymmetric information
- Shipment lead time hedging and coordination in prefabricated construction supply chain
This page was built for publication: Supply chain coordination with controllable lead time and asymmetric information
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q439339)