A dynamic forecasting model for job shop flowtime prediction and tardiness control
From MaRDI portal
Publication:4398975
DOI10.1080/00207549508930210zbMath0916.90123MaRDI QIDQ4398975
Publication date: 30 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930210
90B30: Production models
Related Items
An integrated system for controlling shop loading and work flow, A study of simple rules for subcontracting in make-to-order manufacturing, A GA-based NN approach for makespan estimation, Lead time selection and the behaviour of work flow in job shops, Job shop leadtime requirements under conditions of controlled delivery performance, Makespan estimation in batch process industries: A comparison between regression analysis and neural networks, New approaches to due date assignment in job shops, Manufacturing lead time estimation using data mining, Dynamic job shop scheduling for missed due date performance, Multi-agent-based workload control for make-to-order manufacturing
Cites Work