A dynamic forecasting model for job shop flowtime prediction and tardiness control
From MaRDI portal
Publication:4398975
DOI10.1080/00207549508930210zbMath0916.90123OpenAlexW2026225413MaRDI QIDQ4398975
Publication date: 30 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930210
Related Items (10)
Job shop leadtime requirements under conditions of controlled delivery performance ⋮ A GA-based NN approach for makespan estimation ⋮ New approaches to due date assignment in job shops ⋮ Multi-agent-based workload control for make-to-order manufacturing ⋮ A study of simple rules for subcontracting in make-to-order manufacturing ⋮ An integrated system for controlling shop loading and work flow ⋮ Manufacturing lead time estimation using data mining ⋮ Dynamic job shop scheduling for missed due date performance ⋮ Lead time selection and the behaviour of work flow in job shops ⋮ Makespan estimation in batch process industries: A comparison between regression analysis and neural networks
Cites Work
This page was built for publication: A dynamic forecasting model for job shop flowtime prediction and tardiness control