Single–machine scheduling with random machine breakdowns and randomly compressible processing times
From MaRDI portal
Publication:4495504
DOI10.1080/07362990008809689zbMath0973.90035WikidataQ126240484 ScholiaQ126240484MaRDI QIDQ4495504
No author found.
Publication date: 10 August 2000
Published in: Stochastic Analysis and Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/07362990008809689
90B35: Deterministic scheduling theory in operations research
Related Items
A stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costs, Scheduling deteriorating jobs on a single machine subject to breakdowns, Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns, Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties, Risk measure of job shop scheduling with random machine breakdowns, Optimal rules for single machine scheduling with stochastic breakdowns, Job sequencing and due date assignment in a single machine shop with uncertain processing times
Cites Work
- A survey of results for sequencing problems with controllable processing times
- A two-machine flow shop scheduling problem with controllable job processing times
- A bicriterion approach to time/cost trade-offs in sequencing
- Scheduling jobs on a single machine with release dates, delivery times and controllable processing times: Worst-case analysis
- Single-machine sequencing with controllable processing times
- Two parallel machine sequencing problems involving controllable job processing times
- Bounds on optimal values in stochastic scheduling
- Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine
- Technical Note—Single Machine Scheduling with Controllable Processing Times and Number of Jobs Tardy
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties
- Introduction to Stochastic Programming
- Scheduling to minimize the total compression and late costs
- The single-machine absolute-deviation early-tardy problem with random completion times
- Single-machine scheduling subject to stochastic breakdowns
- Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties