Publication:4883172
From MaRDI portal
DOI<573::AID-NAV9>3.0.CO;2-4 10.1002/(SICI)1520-6750(199606)43:4<573::AID-NAV9>3.0.CO;2-4zbMath0848.90067MaRDI QIDQ4883172
Umar M. Al-Turki, M. Raghavachari, John Mittenthal
Publication date: 1 July 1996
single machine; sequencing; machine breakdowns; completion times; earliness, and tardiness penalties; weighted combination of due dates
90B35: Deterministic scheduling theory in operations research
90B25: Reliability, availability, maintenance, inspection in operations research
93E03: Stochastic systems in control theory (general)
Related Items
Scheduling problems with random processing times under expected earliness/tardiness costs, Single–machine scheduling with random machine breakdowns and randomly compressible processing times, Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem, Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties, Job sequencing and due date assignment in a single machine shop with uncertain processing times, Common due-date assignment and scheduling on single machine with exponential processing times.