Bicriteria sequencing for just-in-time mixed-model assembly lines
From MaRDI portal
Publication:4525560
Recommendations
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
- Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Just-in-time sequencing algorithms for mixed-model production systems
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
Cited in
(22)- Sequencing mixed-model assembly lines: survey, classification and model critique
- A bicriterion objective for levelling the schedule of a mixed-model, JIT assembly process
- Human factor policy testing in the sequencing of manual mixed model assembly lines.
- Interactive bicriterion decision support for a large scale industrial scheduling system
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
- Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
- A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
- Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication
- Evaluation of Just-In-Time alternatives in the electric wire-harness industry
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
- A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviour
- Just-in-time sequencing algorithms for mixed-model production systems
- Just-in-time sequencing in mixed-model production systems relating with fair representation in apportionment theory
- Mixed-model just-in-time sequencing problem with work overload
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
- Sequence-to-customer goal with stochastic demands for a mixed-model assembly line
- Mixed-model assembly line sequencing using beam search
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
- A scatter search based hyper-heuristic for sequencing a mixed-model assembly line
- Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
- Algorithms for the car sequencing and the level scheduling problem
This page was built for publication: Bicriteria sequencing for just-in-time mixed-model assembly lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4525560)