Bicriteria sequencing for just-in-time mixed-model assembly lines
Under a Just-In-Time (JIT) pull system the sequencing of products requires the satisfaction of two main goals: (1) keeping a constant rate of usage of parts, and (2) smoothing the workload at work stations to avoid line stoppages. By using a practical observation related to JIT delivery systems we propose a two-step approach, where in the first step we consider only goal (1) by applying a benchmark heuristic. In the second step we focus on goal (2), by investigating the effectiveness of a spacing-constraint based approach, commonly used in the automotive industry, in comparison with a more general time-based one. We designed and conducted a simulation experiment based on the practical situation of final assembly lines and we found that the benchmark heuristic represents an appropriate choice for step one (based on a new performance measure that represents a lower bound on variation in parts utilization). For the second step, related to workload smoothing, the spacing-constraint based method presents better achievement than the time-based one.
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
- Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Just-in-time sequencing algorithms for mixed-model production systems
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- Sequencing mixed-model assembly lines: survey, classification and model critique
- A bicriterion objective for levelling the schedule of a mixed-model, JIT assembly process
- Human factor policy testing in the sequencing of manual mixed model assembly lines.
- Interactive bicriterion decision support for a large scale industrial scheduling system
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
- Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
- A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
- Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication
- Evaluation of Just-In-Time alternatives in the electric wire-harness industry
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
- A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviour
- Just-in-time sequencing algorithms for mixed-model production systems
- Just-in-time sequencing in mixed-model production systems relating with fair representation in apportionment theory
- Mixed-model just-in-time sequencing problem with work overload
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
- Sequence-to-customer goal with stochastic demands for a mixed-model assembly line
- Mixed-model assembly line sequencing using beam search
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
- A scatter search based hyper-heuristic for sequencing a mixed-model assembly line
- Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
- Algorithms for the car sequencing and the level scheduling problem
This page was built for publication: Bicriteria sequencing for just-in-time mixed-model assembly lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4525560)