Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs
From MaRDI portal
Publication:4595325
DOI10.1142/S0217595917500245zbMath1379.90008OpenAlexW2752506429MaRDI QIDQ4595325
Publication date: 30 November 2017
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595917500245
Related Items (5)
Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices ⋮ Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints ⋮ A note on competing-agent Pareto-scheduling ⋮ Single-machine scheduling with positional due indices and positional deadlines ⋮ ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost
Cites Work
- Unnamed Item
- Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption
- Executing production schedules in the face of uncertainties: a review and some future directions
- Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Rescheduling for Multiple New Orders
- Rescheduling for Job Unavailability
- Algorithms for Scheduling Runway Operations Under Constrained Position Shifting
- RESCHEDULING WITH RELEASE DATES TO MINIMIZE TOTAL SEQUENCE DISRUPTION UNDER A LIMIT ON THE MAKESPAN
- Rescheduling for New Orders
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs