Minimizing response time in a two-stage supply chain system with variable lead time and stochastic demand
From MaRDI portal
Publication:4671256
Recommendations
- Minimizing customer order lead-time in a two-stage assembly supply chain
- A continuous review two-echelon supply chain with stochastic lead-times
- Impact of uncertain demand and lead-time reduction on two-echelon supply chain
- Random lead times and expedited orders in \((Q,r)\) inventory systems
- SETUP COST AND LEAD TIME REDUCTIONS ON STOCHASTIC INVENTORY MODELS WITH A SERVICE LEVEL CONSTRAINT
Cites work
- scientific article; zbMATH DE number 3216838 (Why is no real title available?)
- A delivery‐lag inventory model with an emergency provision (the single‐period case)
- Leadtime-inventory trade-offs in assemble-to-order systems
- Reordering strategies for a newsboy-type product
- Stochastic inventory model with controllable lead time
Cited in
(9)- Advanced supply chain planning with mixtures of backorders, lost sales, and lost contract
- Modeling customer impatience in a newsboy problem with time-sensitive shortages
- Deposit Design for a Production System with Impatient Customers
- Responsive make‐to‐order supply chain network design
- Supply–demand hub in industrial clusters: a stochastic approach
- Time and quantity dependent waiting costs in a newsvendor problem with backlogged shortages
- Minimizing customer order lead-time in a two-stage assembly supply chain
- Coordinating production and shipment decisions in a two-stage supply chain with time-sensitive demand
- Optimization models for the dynamic facility location and allocation problem
This page was built for publication: Minimizing response time in a two-stage supply chain system with variable lead time and stochastic demand
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4671256)