scientific article; zbMATH DE number 2084779
From MaRDI portal
Publication:4735937
Recommendations
- Production Planning by Mixed Integer Programming
- A solution approach of production planning problems based on compact formulations for single-item lot-sizing models. (Abstract of thesis)
- Deterministic lotsizing models for production planning
- Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition
- A polyhedral approach to a production planning problem
Cited in
(20)- An integrated mathematical programming model for offset planning.
- Time continuity in discrete time models. New approaches for production planning in process industries.
- Workforce planning in a lotsizing mail processing problem
- Formulating and solving production planning problems
- Long range planning in the process industries: A projection approach
- Mathematical programming formulations for approximate simulation of multistage production systems
- Conic programming models for production planning with clearing functions: formulations and duality
- Planning production and workforce in a discrete-time financial model using scenarios modeling
- Models and solution techniques for production planning problems with increasing byproducts
- On multi-item economic lot-sizing with remanufacturing and uncapacitated production
- Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
- Fix and relax heuristic for a stochastic lot-sizing problem
- Using \textsc{Zimpl} for modeling production planning problems
- LS-LIB: a library of tools for solving production planning problems
- A polyhedral study of production ramping
- Reformulation of the Multiperiod MILP Model for Capacity Expansion of Chemical Processes
- Mathematical programming models for optimizing partial-order plan flexibility
- Production Planning by Mixed Integer Programming
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4735937)