scientific article; zbMATH DE number 2086446
From MaRDI portal
Publication:4736907
Recommendations
- A TWO-STAGE FLOWSHOP SCHEDULING WITH LIMITED BUFFER STORAGE
- Heuristic algorithms for the two-stage hybrid flowshop problem
- Solving the continuous flow-shop scheduling problem by metaheuristics.
- Two-Stage, Hybrid Flowshop Scheduling Problem
- A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time
Cited in
(2)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4736907)