scientific article; zbMATH DE number 2087880
From MaRDI portal
Publication:4738892
zbMATH Open1048.68597MaRDI QIDQ4738892FDOQ4738892
Authors: Andrea Gozzi, Massimo Paolucci, Antonio Boccalatte
Publication date: 11 August 2004
Full work available at URL: http://link.springer.de/link/service/series/0558/bibs/2322/23220198.htm
Title of this publication is not available (Why is that?)
Recommendations
- scientific article; zbMATH DE number 1670581
- Parallel machines scheduling with machine preference via agent-based approach
- Solving then-job 3-stage flexible flowshop scheduling problem using an agent-based approach
- A multi-agent system for the weighted earliness tardiness parallel machine problem
- An agent-based approach for scheduling multiple machines
Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20) Deterministic scheduling theory in operations research (90B35)
Cited In (12)
- Auction-based distributed scheduling in a dynamic job shop environment
- An agent-based approach for scheduling multiple machines
- Integrated process planning and scheduling/rescheduling—an agent-based approach
- Manufacturing system scheduling based on multi-agent cooperation game
- An agent-based negotiation approach to integrate process planning and scheduling
- Development of a hybrid negotiation scheme for multi-agent manufacturing systems
- Solving then-job 3-stage flexible flowshop scheduling problem using an agent-based approach
- Agent-based multiple shop floor manufacturing scheduler
- Title not available (Why is that?)
- Using colored Petri nets to predict future states in agent-based scheduling and planning systems
- Timing constraints' optimization of reserved tasks in the distributed shop-floor scheduling
- Agent-based scheduling in production systems
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4738892)