Performance of maximum EWMA control chart in the presence of measurement error using auxiliary information
From MaRDI portal
Publication:5042142
DOI10.1080/03610918.2020.1772301OpenAlexW3041414327MaRDI QIDQ5042142FDOQ5042142
Authors:
Publication date: 18 October 2022
Published in: Communications in Statistics. Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610918.2020.1772301
auxiliary informationmeasurement errorstatistical process controlquality characteristicmax-EWMAMEAI control chart
Cites Work
- Statistical quality control. A modern introduction
- CONTINUOUS INSPECTION SCHEMES
- Exponentially weighted moving average control chart using auxiliary variable with measurement error
- An efficient class of estimators for the population mean using auxiliary information in systematic sampling
- An EWMA-type control chart for monitoring the process mean using auxiliary information
- Effect of measurement error on exponentially weighted moving average control charts under ranked set sampling schemes
- A new synthetic control chart for monitoring process mean using auxiliary information
- Monitoring process mean and variability with one double EWMA chart
- Shewhart x-charts with estimated process variance
- Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning
- Using a novel approach to assess process performance in the presence of measurement errors
- Title not available (Why is that?)
- A new Max-HEWMA control chart using auxiliary information
- EWMA Chart and Measurement Error
- Gauge imprecision effect on the performance of theX-Scontrol chart
- Measurement error effect on the CUSUM control chart
- Identifying the time of a step change with multivariate single control charts
- The effects of measurement error on the MAX EWMAMS control chart
Cited In (8)
- Homogeneously weighted moving average-variance control chart using auxiliary information
- The effect of gauge measurement errors on double sampling X¯ control chart
- Performance of Max-EWMA control chart for joint monitoring of mean and variance with measurement error
- Joint monitoring of mean and variance using Max-EWMA for Weibull process
- The effects of measurement error on the MAX EWMAMS control chart
- The effect of measurement errors on the performance of the homogenously weighted moving average X¯ monitoring scheme with estimated parameters
- The behavior of ewma—type quality control schemes in the case of mixture alternatives
- Auxiliary information based maximum EWMA and DEWMA charts with variable sampling intervals for process mean and variance
This page was built for publication: Performance of maximum EWMA control chart in the presence of measurement error using auxiliary information
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5042142)