Shewhart x-charts with estimated process variance
From MaRDI portal
Publication:3928875
DOI10.1080/03610928108828152zbMath0474.62093OpenAlexW2095271437MaRDI QIDQ3928875
No author found.
Publication date: 1981
Published in: Communications in Statistics - Theory and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610928108828152
Related Items (23)
Parametric control charts ⋮ Properties and performance of thec-chart for attributes data ⋮ Performance of maximum EWMA control chart in the presence of measurement error using auxiliary information ⋮ Conditional design of the EWMA median chart with estimated parameters ⋮ Run length distributions and economic design of \(\overline{X}\) charts with unknown process variance ⋮ Multiple means shewhart charts using variable sampling intervals ⋮ Conditional design of the CUSUM median chart for the process position when process parameters are unknown ⋮ Symmetric -charts: Sensitivity to nonnormality and control-limit estimation ⋮ Adaptive c-chart with estimated parameter ⋮ Nonparametric quality control charts based on the sign statistic ⋮ Minimum control charts ⋮ EVVMA and cusum control charts in the presence of correlation ⋮ Empirical Non-Parametric Control Charts: Estimation Effects and Corrections ⋮ Parameter estimation and design considerations in prospective applications of theX¯ chart ⋮ Life and Work of Bhaskar Kumar Ghosh ⋮ Run rules based phase IIcandnpcharts when process parameters are unknown ⋮ ON THE EVALUATION OF CONTROL CHART LIMITS BASED ON PREDICTIVE DISTRIBUTIONS ⋮ Exceedance probabilities for parametric control charts ⋮ The double sampling S2 chart with estimated process variance ⋮ Are estimated control charts in control? ⋮ Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning ⋮ The run length distributions of theR, sands2control charts when σ is estimated ⋮ Data driven choice of control charts
Cites Work
This page was built for publication: Shewhart x-charts with estimated process variance