Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning

From MaRDI portal
Publication:4490147

DOI10.1080/03610910008813602zbMath0968.62558OpenAlexW2011745321MaRDI QIDQ4490147

No author found.

Publication date: 10 July 2000

Published in: Communications in Statistics - Simulation and Computation (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/03610910008813602




Related Items (25)

Parametric control chartsProperties and performance of thec-chart for attributes data\(R\)-charts for the exponential, Laplace and logistic processesPerformance of maximum EWMA control chart in the presence of measurement error using auxiliary informationCombined X-bar and CRL charts for the gamma processInverse Gaussian Control Charts for Monitoring Process VariabilityA new distribution-free monitoring scheme based on ranksGlobally applicable control chart for online monitoring of stability of process meanNonparametric control charts based on runs and Wilcoxon-type rank-sum statisticsAddressing the effect of parameter estimation on phase II monitoring of multivariate multiple linear profiles via a new cluster-based approachPhase II monitoring of multivariate profiles with estimated parameters and optimal phase I subgroupsNonparametric control charts based on order statistics: Some advancesStatistical process control (SPC) for short production run with Cauchy distribution, a case study with corrected numbers approachA new variable control chart under generalized multiple dependent state samplingThe effect of parameters estimation on the performance of variables control charts under repetitive samplingSymmetric -charts: Sensitivity to nonnormality and control-limit estimationMinimum control chartsA test for suitability of the preliminary samples for constructing control limits ofchartEmpirical Non-Parametric Control Charts: Estimation Effects and CorrectionsParameter estimation and design considerations in prospective applications of theX¯ chartA Distribution-Free Control Chart Based on Order StatisticsExceedance probabilities for parametric control chartsAre estimated control charts in control?Design of a new variable Shewhart control chart using multiple dependent state repetitive samplingData driven choice of control charts




Cites Work




This page was built for publication: Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning