MULTIPLE DEFERRED STATE SAMPLING INSPECTION PLAN FOR VARIABLES BASED ON ONE-SIDED PROCESS CAPABILITY INDEX
From MaRDI portal
Publication:5055103
DOI10.17654/0972086322011OpenAlexW4293066305MaRDI QIDQ5055103
No author found.
Publication date: 12 December 2022
Published in: Far East Journal of Theoretical Statistics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.17654/0972086322011
process capability indexoperating characteristic functionaverage sample numberconditional sampling planmultiple deferred state sampling plan
Related Items (1)
Cites Work
- Variables sampling plans with PPM fraction of defectives and process loss consideration
- On the distributions of the estimated process capability indices
- Designing Variables Sampling Plans with Process Loss Consideration
- Selection of Chain Sampling Plans ChSP-1 and ChSP-(0.1) for Given Acceptable Quality Level and Limiting Quality Level
- Multiple dependent state repetitive sampling plans based on one-sided process capability indices
- MULTIPLE DEFERRED STATE SAMPLING INSPECTION PLAN FOR VARIABLES BASED ON ONE-SIDED PROCESS CAPABILITY INDEX
- A variable sampling plan using generalized multiple dependent state based on a one-sided process capability index
- Repetitive variable acceptance sampling plan for one-sided specification
- Variable repetitive group sampling plans with process loss consideration
- Variables Sampling Plans Based on the Normal Distribution
- Sampling Plans for Inspection by Variables
- Unnamed Item
This page was built for publication: MULTIPLE DEFERRED STATE SAMPLING INSPECTION PLAN FOR VARIABLES BASED ON ONE-SIDED PROCESS CAPABILITY INDEX