An improved sampling plan by variables inspection with consideration of process yield and quality loss
From MaRDI portal
Publication:5107463
DOI10.1080/00949655.2019.1619739OpenAlexW2945588215WikidataQ127864605 ScholiaQ127864605MaRDI QIDQ5107463
Publication date: 27 April 2020
Published in: Journal of Statistical Computation and Simulation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00949655.2019.1619739
operating characteristic curveprocess capability indicesnonlinear optimization problemconsumer's riskproducer's risklot sentencing
Related Items (3)
Designing of Variables Double Sampling Plan Under Rectifying Inspection for Consumer Protection ⋮ Developing process-yield-based acceptance sampling plans for AR(1) auto-correlated process ⋮ An adjustable inspection scheme for lot sentencing based on one-sided capability indices
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A modified variables repetitive group sampling plan with the consideration of preceding lots information
- Variable sampling inspection for resubmitted lots based on process capability index \(C_{pk}\) for normally distributed items
- A review and interpretations of process capability indices
- Developing a sampling plan by variables inspection for controlling lot fraction of defectives
- Estimating process capability index \({C }_{pmk}\) for asymmetric tolerances: distributional proper\-ties
- A Markovian approach to determining optimum process target levels for a multi-stage serial production system
- An efficient inspection scheme for variables based on Taguchi capability index
- Capability-based quick switching sampling system for lot disposition
- Variable-sampling plans based on lifetime-performance index under exponential distribution with censoring and its extensions
- A variables sampling plan based on \(C_{\text{pmk}}\) for product acceptance determination
- Design and Construction of a Variables Repetitive Group Sampling Plan for Unilateral Specification Limit
- Repetitive group sampling procedure for variables inspection
- Acceptance Sampling in Quality Control,Third Edition
- Repetitive group sampling plan based on the process capability index for the lot acceptance problem
- Acceptance sampling plans for linear profiles with one-sided specifications
- Developing and designing of an efficient variables sampling system based on the process capability index
- Developing a variables repetitive group sampling plan based on process capability indexCpkwith unknown mean and variance
- Variable repetitive group sampling plans with process loss consideration
- Design and Evaluation of a Repetitive Group Sampling Plan
- Designing of Variables Repetitive Group Sampling Plan Involving Minimum Average Sample Number
This page was built for publication: An improved sampling plan by variables inspection with consideration of process yield and quality loss