Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
From MaRDI portal
Publication:5564932
DOI10.1287/mnsc.14.3.127zbMath0178.23102OpenAlexW2019113090MaRDI QIDQ5564932
Wagner, Harvey M., John Yuan, Steven A. Lippman, A. J. Rolfe
Publication date: 1967
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.14.3.127
Related Items (7)
Discounted production scheduling and employment smoothing ⋮ Design of production-inventory control systems incorporating fast-sampling control policies with implementation lead time ⋮ Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure ⋮ A forward algorithm and planning horizon procedure for the production smoothing problem without inventory ⋮ Production scheduling and inventory control for multi-stage manufacturing systems ⋮ Note on utilizing stochastic optimal control in aggregate production planning ⋮ Singular pertubation methods in the synthesis of control policies for production-inventory systems
This page was built for publication: Optimal Production Scheduling and Employment Smoothing with Deterministic Demands