Production scheduling and inventory control for multi-stage manufacturing systems
From MaRDI portal
Publication:3770355
DOI10.1080/00207728708967106zbMath0632.93005OpenAlexW2034800159MaRDI QIDQ3770355
Publication date: 1987
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207728708967106
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Inventory, storage, reservoirs (90B05) Synthesis problems (93B50) General systems theory (93A99) Singular perturbations for ordinary differential equations (34E15)
Cites Work
- Singular perturbation methods in the design of tracking systems incorporating high-gain error-actuated controllers
- Singular pertubation methods in the synthesis of control policies for production-inventory systems
- Synthesis of control policies for cascaded production-inventory systems
- Minimum settling-time control policies for cascaded production-inventory systems
- Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
- An approach to determine optimal policies for production—inventory systems†
- Economic Lot Size Determination in Multi-Stage Assembly Systems
This page was built for publication: Production scheduling and inventory control for multi-stage manufacturing systems