A Simple CPM Time-Cost Tradeoff Algorithm
From MaRDI portal
Publication:5618265
DOI10.1287/mnsc.17.6.B354zbMath0215.29501MaRDI QIDQ5618265
Publication date: 1971
Published in: Management Science (Search for Journal in Brave)
Related Items
The discrete time/cost trade-off problem: Extensions and heuristic procedures ⋮ A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search ⋮ The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights ⋮ Time-cost trade-off analysis of project networks in fuzzy environments ⋮ Modeling stochastic project time-cost trade-offs with time-dependent activity durations ⋮ A heuristic procedure for solving the dynamic probabilistic project expediting problem ⋮ Unnamed Item ⋮ New fuzzy models for time-cost trade-off problem ⋮ New computational results for the discrete time/cost trade-off problem with time-switch constraints ⋮ A new approach based on the surrogating method in the project time compression problems ⋮ Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem ⋮ Project management with time, cost, and quality considerations ⋮ A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project ⋮ A network flow procedure for project crashing with penalty nodes