A Note on the Relation between the Product Rate Variation (PRV) Problem and the Apportionment Problem
From MaRDI portal
Publication:5690278
DOI10.1057/jors.1996.177zbMath0863.90082OpenAlexW2091941535MaRDI QIDQ5690278
Joaquín Bautista, Ramon Companys, Albert Corominas
Publication date: 15 January 1997
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1996.177
Related Items (13)
Minimising maximum response time ⋮ The multi-objective assembly line worker integration and balancing problem of type-2 ⋮ Response time variability ⋮ Just-in-Time Scheduling in Modern Mass Production Environment ⋮ The maximum deviation just-in-time scheduling problem. ⋮ Webster sequences, apportionment problems, and just-in-time sequencing ⋮ Apportionment methods and the Liu-Layland problem ⋮ On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ A simple approach to the product rate variation problem via axiomatics ⋮ Note on cyclic sequences in the product rate variation problem ⋮ Parametric methods of apportionment, rounding and production ⋮ Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem
This page was built for publication: A Note on the Relation between the Product Rate Variation (PRV) Problem and the Apportionment Problem