Advances in Neural Networks – ISNN 2005
From MaRDI portal
Publication:5706992
DOI10.1007/B136476zbMATH Open1082.68710OpenAlexW4300756629MaRDI QIDQ5706992FDOQ5706992
Authors: Lixin Tang, Yanyan Zhang
Publication date: 23 November 2005
Published in: Lecture Notes in Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/b136476
Recommendations
- A hybrid neural network-genetic algorithm approach for permutation flow shop scheduling
- A new adaptive neural network and heuristics hybrid approach for job-shop scheduling
- Advances in Neural Networks – ISNN 2005
- Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times
- Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times
Learning and adaptive systems in artificial intelligence (68T05) Neural networks for/in biological studies, artificial life and related topics (92B20)
Cited In (6)
- A new adaptive neural network and heuristics hybrid approach for job-shop scheduling
- Optimisation of makespan of a flow shop problem using multi layer neural network
- A hybrid neural network-genetic algorithm approach for permutation flow shop scheduling
- The hybrid flow shop scheduling problem
- A hybrid neural network approach to minimize total completion time on a single batch processing machine
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
This page was built for publication: Advances in Neural Networks – ISNN 2005
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5706992)