Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases

From MaRDI portal
Publication:5948205

DOI10.1023/A:1010918518726zbMath0991.90523MaRDI QIDQ5948205

Chung-Yee Lee, Lei Lei

Publication date: 31 October 2001

Published in: Annals of Operations Research (Search for Journal in Brave)




Related Items (18)

The construction of stable project baseline schedulesA survey of scheduling with controllable processing timesInverse interval scheduling via reduction on a single machineControllable processing times in project and production management: analysing the trade-off between processing times and the amount of resourcesResource-constrained multi-project scheduling problem: a surveyAn applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesScheduling a batching machine with convex resource consumption functionsA branch and bound algorithm for scheduling jobs with controllable processing times on a single machine to meet due datesBi-criteria and tri-criteria analysis to minimize maximum lateness makespan and resource consumption for scheduling a single machineBicriteria robotic cell scheduling with controllable processing timesSingle-machine scheduling with machine unavailability periods and resource dependent processing timesA bicriteria approach to minimize maximal lateness and resource consumption for scheduling a single machineThe resource dependent assignment problem with a convex agent cost functionJust-in-time scheduling with controllable processing times on parallel machinesA tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-datesRevenue sharing for resource transfer among projectsOptimal due date assignment and resource allocation in a group technology scheduling environmentPersonnel scheduling and supplies provisioning in emergency relief operations






This page was built for publication: Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases