Minimizing the total waiting time of intermediate products in a manufacturing process
From MaRDI portal
Publication:6088134
DOI10.1111/itor.12343OpenAlexW2524211478MaRDI QIDQ6088134
Publication date: 16 November 2023
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.12343
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- The third comprehensive survey on scheduling problems with setup times/costs
- Single machine quadratic penalty function scheduling with deteriorating jobs and group technology
- Single-machine scheduling with linear decreasing deterioration to minimize earliness penalties
- Job scheduling methods for reducing waiting time variance
- Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
- A survey of scheduling problems with setup times or costs
- Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times
- Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs
- Simultaneous Minimization of Mean and Variation of Flow Time and Waiting Time in Single Machine Systems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Workforce Planning in Mixed Model Assembly Systems
- Single Machine Scheduling with Major and Minor Setup Times: A Tabu Search Approach
- Minimizing a Quadratic Cost Function of Waiting Times in Single-Machine Scheduling
- Minimising average passenger waiting time in personal rapid transit systems
This page was built for publication: Minimizing the total waiting time of intermediate products in a manufacturing process