Different MIP formulations for a dynamic lot-sizing model with rework of defectives
From MaRDI portal
Publication:6606583
DOI10.1007/978-3-031-24907-5_52zbMATH Open1547.90013MaRDI QIDQ6606583FDOQ6606583
Authors: Steffen Rudert
Publication date: 17 September 2024
Recommendations
- Lotsizing in a production system with rework and product deterioration
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
- Lot sizing in a production system with rework and product deterioration
- Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
Cites Work
This page was built for publication: Different MIP formulations for a dynamic lot-sizing model with rework of defectives
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6606583)