Using aggregation to optimize long-term production planning at an underground mine
DOI10.1016/J.EJOR.2005.09.008zbMATH Open1103.90333OpenAlexW2052939735MaRDI QIDQ852993FDOQ852993
Authors: Alexandra M. Newman, Mark E. Kuchta
Publication date: 15 November 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.09.008
Recommendations
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Optimizing long-term production plans in underground and open-pit copper mines
- Optimization-based heuristics for underground mine scheduling
- Long- and short-term production scheduling at LKAB's Kiruna mine
- Aggregation heuristic for the open-pit block scheduling problem
heuristic integer programming algorithmsmining and metals industriesproduction scheduling applications
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Integer programming (90C10) Production models (90B30)
Cites Work
- Modelling practical lot-sizing problems as mixed-integer programs
- Title not available (Why is that?)
- A procedure for optimizing tactical response in oil spill clean up operations
- Aggregation and Disaggregation Techniques and Methodology in Optimization
- The traffic flow management rerouting problem in air traffic control: A dynamic network flow approach
- Aggregation and Mixed Integer Rounding to Solve MIPs
- Polynomial-Time Aggregation of Integer Programming Problems
- Aggregating diophantine equations
- A Stochastic Convergence Model for Portfolio Selection
- A New Knapsack Solution Approach by Integer Equivalent Aggregation and Consistency Determination
Cited In (25)
- A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models
- Challenges and Advances in A Priori Routing
- Strategic planning of an underground mine with variable cut-off grades
- Optimizing transient gas network control for challenging real-world instances using MIP-based heuristics
- Machine scheduling in underground mining: an application in the potash industry
- Optimization-based heuristics for underground mine scheduling
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling
- Optimization for L1-Norm Error Fitting via Data Aggregation
- Optimizing the open pit-to-underground mining transition
- Underground mine scheduling under uncertainty
- Uncertainty integration in dynamic mining reserves
- Short-term planning optimization model for underground mines
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Runtime reduction techniques for the probabilistic traveling salesman problem with deadlines
- Maximizing the net present value of a Steiner tree
- Solving network design problems via iterative aggregation
- Optimizing a mineral value chain with market uncertainty using Benders decomposition
- Optimizing long-term production plans in underground and open-pit copper mines
- Longwall mining automation an application of minimum-variance smoothing [Applications of Control]
- A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS
- An efficient decision making process for vehicles operations in underground mining
- A review of long- and short-term production scheduling at LKAB's Kiruna Mine
- Long- and short-term production scheduling at LKAB's Kiruna mine
- Scalable timing-aware network design via Lagrangian decomposition
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining
Uses Software
This page was built for publication: Using aggregation to optimize long-term production planning at an underground mine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q852993)