A hybrid meta-heuristic for the batching problem in just-in-time flow shops
From MaRDI portal
(Redirected from Publication:864936)
Recommendations
- Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times
- The hybrid flow shop scheduling problem
- A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment
- Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system
- MIP formulations and heuristics for solving parallel batching problems
Cites work
- A GRASP and path relinking heuristic for rural road network development
- A hybrid meta-heuristic for the batching problem in just-in-time flow shops
- A path relinking approach with ejection chains for the generalized assignment problem
- Analysis and solution to the single-level batch production smoothing problem
- Experiments with a strategic oscillation algorithm for the pallet loading problem
- Fundamentals of scatter search and path relinking
- Future paths for integer programming and links to artificial intelligence
- GRASP with path relinking for three-index assignment
- scientific article; zbMATH DE number 1488569 (Why is no real title available?)
- Intensification and diversification with elite tabu search solutions for the linear ordering problem
- Large-scale controlled rounding using tabu search with strategic oscillation
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Metaheuristics: A bibliography
- Nurse scheduling with tabu search and strategic oscillation
- Path relinking, cycle-based neighbourhoods and capacitated multicommodity network design
- Principles of scatter search
Cited in
(5)- A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment
- Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times
- Batching multiple products on parallel heterogeneous machines in a closed job shop
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
- A hybrid meta-heuristic for the batching problem in just-in-time flow shops
This page was built for publication: A hybrid meta-heuristic for the batching problem in just-in-time flow shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q864936)