Two machine flow shop scheduling problem with weighted WIP costs
From MaRDI portal
(Redirected from Publication:954049)
Recommendations
Cites work
- scientific article; zbMATH DE number 4209899 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problem
- Erratum to: ``Flow shops with WIP and value added costs
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
- Minimizing the total flow time and the tardiness in a two-machine flow shop
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases
- Openshop and flowshop scheduling to minimize sum of completion times
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Some new results in flow shop scheduling
- The Complexity of Flowshop and Jobshop Scheduling
- The complexity of scheduling jobs in repetitive manufacturing systems
- The two-machine total completion time flow shop problem
Cited in
(3)
This page was built for publication: Two machine flow shop scheduling problem with weighted WIP costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q954049)