Recoverable Robustness in Shunting and Timetabling
From MaRDI portal
Recommendations
- Recovery-to-optimality: a new two-stage approach to robustness with an application to aperiodic timetabling
- Recoverable robust timetabling for single delay: Complexity and polynomial algorithms for special cases
- Recoverable Robust Timetables: An Algorithmic Approach on Trees
- Recoverable robustness for train shunting problems
- Recoverable Robust Timetables on Trees
- An empirical analysis of robustness concepts for timetabling
- Evaluation of recoverable-robust timetables on tree networks
- Robust algorithms and price of robustness in shunting problems
- Recoverable robust timetable information
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
Cited in
(27)- Column generation strategies and decomposition approaches for the two-stage stochastic multiple knapsack problem
- Engineering graph-based models for dynamic timetable information systems
- A biobjective approach to recoverable robustness based on location planning
- A survey on robustness in railway planning
- Formulations and algorithms for the recoverable \({\varGamma}\)-robust knapsack problem
- Online knapsack of unknown capacity. How to optimize energy consumption in smartphones
- Recoverable robustness for train shunting problems
- Delay-robust event scheduling
- Dynamic algorithms for recoverable robustness problems
- Robust algorithms and price of robustness in shunting problems
- ROPI -- a robust optimization programming interface for C++
- Recoverable robustness by column generation
- Decomposition approaches for recoverable robust optimization problems
- Recovery-to-optimality: a new two-stage approach to robustness with an application to aperiodic timetabling
- Robust algorithms for sorting railway cars
- Recoverable Robust Timetables on Trees
- The concept of recoverable robustness, linear programming recovery, and railway applications
- Evaluation of recoverable-robust timetables on tree networks
- Line planning in public transportation: models and methods
- Multi-stage recovery robustness for optimization problems: A new concept for planning under disturbances
- Generalized light robustness and the trade-off between robustness and nominal quality
- Engineering graph-based models for dynamic timetable information systems
- Combinatorial and robust optimisation models and algorithms for railway applications
- How to measure the robustness of shunting plans
- Recoverable robust knapsacks: the discrete scenario case
- On the computation of robust examination timetables: methods and experimental results
- On strategic multistage operational two-stage stochastic 0--1 optimization for the rapid transit network design problem
This page was built for publication: Recoverable Robustness in Shunting and Timetabling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3649158)