Resource leveling with subcontracting: algorithms and complexity
From MaRDI portal
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Geometric algorithms and combinatorial optimization
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Optimization guided lower and upper bounds for the resource investment problem
- Preemptive Scheduling of Real-Time Tasks on Multiprocessor Systems
- Project scheduling. A research handbook.
- Resource levelling for projects with schedule-dependent time windows
- Scheduling Opposing Forests
- Scheduling chain-structured tasks to minimize makespan and mean flow time
- Scheduling subject to resource constraints: Classification and complexity
- Scheduling with deadlines and loss functions
This page was built for publication: Resource leveling with subcontracting: algorithms and complexity
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q7231662)