Scheduling manufacturing systems with work-in-process inventory control: Reentrant systems
From MaRDI portal
Recommendations
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Re-entrant lines
- A due-date based production control policy using WIP balance for implementation in semiconductor fabrications
- Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns
Cites work
- A Review of Production Scheduling
- Optimal control of production rate in a failure prone manufacturing system
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Network with Controllable Inputs
Cited in
(7)- Reducing work-in-process inventory in certain classes of flexible manufacturing systems
- Feedback control for priority rules in re-entrant semiconductor manufacturing
- A WIP control policy for tandem lines
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- A novel breakthrough system for mixed production goaling and control in semiconductor manufacturing
- A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
- Coordinating decentralized local schedulers in complex supply chain manufacturing
This page was built for publication: Scheduling manufacturing systems with work-in-process inventory control: Reentrant systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2564335)