Sequencing with uncertain numerical data for makespan minimisation
From MaRDI portal
Recommendations
- scientific article; zbMATH DE number 2073567
- Optimal makespan scheduling with given bounds of processing times
- Minimizing total weighted completion time with uncertain data: a stability approach
- Mean flow time minimization with given bounds of processing times
- scientific article; zbMATH DE number 4125190
Cited in
(19)- The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times
- Stability polyhedra of optimal permutation of jobs servicing
- A MIP formulation for the minmax regret total completion time in scheduling with unrelated parallel machines
- Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
- Single machine scheduling problem with interval processing times to minimize mean weighted completion time
- Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
- Two-machine flow-shop minimum-length scheduling with interval processing times
- Measures of problem uncertainty for scheduling with interval processing times
- Group shops scheduling with makespan criterion subject to random release dates and processing times
- Schedule execution for two-machine flow-shop with interval processing times
- Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
- Minimizing total weighted completion time with uncertain data: a stability approach
- Mean flow time minimization with given bounds of processing times
- Minimizing total weighted flow time of a set of jobs with interval processing times
- Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks
- Exact solutions for the two-machine robust flow shop with budgeted uncertainty
- Minimizing total weighted flow time under uncertainty using dominance and a stability box
- Uncertainty measure for the Bellman-Johnson problem with interval processing times
This page was built for publication: Sequencing with uncertain numerical data for makespan minimisation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3157317)