Uncertainty measure for the Bellman-Johnson problem with interval processing times
From MaRDI portal
Recommendations
- Measures of problem uncertainty for scheduling with interval processing times
- Minimizing total weighted flow time of a set of jobs with interval processing times
- Two-machine flow-shop minimum-length scheduling with interval processing times
- Single machine scheduling problem with interval processing times and total completion time objective
- The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times
Cites work
- Different types of stability of vector integer optimization problem: General approach
- Existence of solutions in vector optimization problems
- Flowshop scheduling problem to minimize total completion time with random and bounded processing times
- scientific article; zbMATH DE number 5345853 (Why is no real title available?)
- scientific article; zbMATH DE number 3780553 (Why is no real title available?)
- Integer programming problems with inexact data: Exact and approximate solutions
- Johnson's problem with stochastic processing times and optimal service level
- Mean flow time minimization with given bounds of processing times
- Minimizing total weighted flow time of a set of jobs with interval processing times
- On Johnson's Two-Machine Flow Shop with Random Processing Times
- On the calculation of the stability radius of an optimal or an approximate schedule
- On the robust single machine scheduling problem
- Optimal makespan scheduling with given bounds of processing times
- Optimal two- and three-stage production schedules with set-up time included
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Quantitative stability analysis for vector problems of 0-1 programming
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
- Schedule execution for two-machine flow-shop with interval processing times
- Scheduling arrivals to a production system in a fuzzy environment
- Sequencing with uncertain numerical data for makespan minimisation
- Stability analysis of an optimal balance for an assembly line with fixed cycle time
- Stability criteria in vector combinatorial bottleneck problems in terms of binary relations
- Stability criterion for a lexicographic Boolean optimization problem
- Stability of a vector integer quadratic programming problem with respect to vector criterion and constraints
- Stability of vector problems of integer optimization: relationship with the stability of sets of optimal and nonoptimal solutions
- Stability radius of a vector integer linear programming problem: Case of a regular norm in the space of criteria
- Stochastically minimizing the makespan in two-machine flow shops without blocking
- The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times
- Two-machine flow-shop minimum-length scheduling with interval processing times
- Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times
Cited in
(6)- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
- A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure
- Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times
- Measures of problem uncertainty for scheduling with interval processing times
- On the operational definition of processing time uncertainty
- Stability polyhedra of optimal permutation of jobs servicing
This page was built for publication: Uncertainty measure for the Bellman-Johnson problem with interval processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2452733)