Simulation study of job shop scheduling with due dates
From MaRDI portal
Recommendations
- Integration of priority dispatching and due-date assignment in a job shop
- Regression-based due date assignment rules for improved assembly shop performance
- A Simulation Study of Due-date Assignment Rules in a Dynamic Job Shop
- Dynamic assignation of due-dates in an assembly shop based in simulation
- Using dispatching rules for job shop scheduling with due date-based objectives
Cited in
(10)- Optimal total-work-content-power due-date determination and sequencing
- Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine
- Single machine scheduling with common due data assignment in a group technology environment
- New approaches to due date assignment in job shops
- A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation
- Integration of priority dispatching and due-date assignment in a job shop
- Dynamic assignation of due-dates in an assembly shop based in simulation
- A Simulation Study of Due-date Assignment Rules in a Dynamic Job Shop
- Due-date setting methodologies based on simulated annealing—an experimental study in a real-life job shop
- Analysis of Job Flow-Time in a Job Shop
This page was built for publication: Simulation study of job shop scheduling with due dates
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3778530)